10
|
Commissioning
Installer reference guide
204
EPRA14~W1 + ETVH/9W(G)
Daikin Altherma 3 H HT F
4P587502-1A – 2020.01
4
Select
OK
to confirm.
Result:
The test run starts. It stops automatically when ready
(±30 min).
To stop the test run manually:
—
1
In the menu, go to
Stop test run
.
2
Select
OK
to confirm.
INFORMATION
If the outdoor temperature is outside the range of operation, the unit may NOT
operate or may NOT deliver the required capacity.
To monitor leaving water and tank temperatures
During test run, the correct operation of the unit can be checked by monitoring its
leaving water temperature (heating/cooling mode) and tank temperature
(domestic hot water mode).
To monitor the temperatures:
1
In the menu, go to
Sensors
.
2
Select the temperature information.
10.4.4 Actuator test run
Purpose
Perform an actuator test run to confirm the operation of the different actuators.
For example, when you select
Pump
, a test run of the pump will start.
To perform an actuator test run
Conditions:
Make sure all operation is disabled. Go to [C]:
Operation
and turn off
Room
,
Space heating/cooling
and
Tank
operation.
1
Set the user permission level to Installer. See
—
2
Go to [A.2]:
Commissioning
>
Actuator test run
.
3
Select a test from the list.
Example:
Pump
.
4
Select
OK
to confirm.
Result:
The actuator test run starts. It stops automatically when
ready (±30 min).
To stop the test run manually:
—
1
In the menu, go to
Stop test run
.
2
Select
OK
to confirm.
Possible actuator test runs
▪
Backup heater 1
test
▪
Backup heater 2
test
▪
Pump
test
Summary of Contents for Altherma 3 H HT EPRA14DAW1
Page 258: ......
Page 259: ......
Page 260: ...4P587502 1A 2020 01 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...