56
6
-
5
3-point hitch implement And loAder operAtion
(1) top link
(2) lift rod (l)
(3) lift rod (r)
(4) check chain
(5) lower link
(6) drawbar (optional)
OPERATION fOR 3-POINT HITCH IMPLEMENT MOuNTINg
COMPONENTs
(1) lift rod
(2) turn buckle
(3) lock nut
1. Adjust the implement balance by
turning the turn buckle.
2. After adjustment, secure it with the
lock nut.
ADjusTMENT Of LIfT ROD
6
11
5
4
5
3
2
5
6
4
5
3
2
T22O601A
TC2O603A
TC220-영문-수출향(법인향)-OM-06.indd 5
2020-01-23 오전 9:17:55
Summary of Contents for CK2610CHSE
Page 12: ...TC220 OM 00 indd 12 2020 02 20 2 51 53...
Page 40: ...1 28 CK3510 H C CH SE CK4010 H C CH SE T22O102D TC220 BOBCAT OM 01 indd 28 2020 02 20 2 49 15...
Page 41: ...1 29 For safe operation 1 t22o103B ROPS TC220 BOBCAT OM 01 indd 29 2020 02 20 2 49 16...
Page 42: ...1 30 CK3510 H C CH SE CK4010 H C CH SE T22O104a TC220 BOBCAT OM 01 indd 30 2020 02 20 2 49 16...
Page 52: ...MEMO MEMO TC220 OM 02 indd 6 2020 12 10 10 44 12...
Page 68: ...MEMO MEMO TC220 OM 03 indd 16 2020 01 23 9 13 03...
Page 130: ...MEMO MEMO TC220 OM 04 indd 62 2020 12 10 10 45 59...
Page 158: ...MEMO mEmO TC220 OM 05 indd 28 2020 01 23 9 15 43...
Page 237: ...10 10 INDEX INDEX 10 2 TC220 OM 10 indd 1 2020 02 13 3 10 38...