The current must be below the maximum value assigned to the equipment in the
Main Controller's equipment configuration page
Verify if the electronic fuse is activated on the EDGE 2 Controller
Verify if the load link is not cut
Verify if a voltage supply reaches the terminal RELAY - COM
Verify if there is no an alarm
If the problem persists, contact AP/Cumberland or GSI Electronics
The variable output
module (SSR) does not
activate the load
Verify if the variable output module (SSR) wiring complies with the wiring diagram
Ensure that the right variable output module (SSR) output is used
Verify if the variable output module (SSR) configuration is set correctly on the EDGE
2 Controller
Verify if the load does not activate the protection.
If the electronic fuse is activated, reset the electronic fuse by resetting it on the
EDGE 2 Controller software
Verify if the load link is not cut
If the problem persists, contact AP/Cumberland or GSI Electronics
EDGE 4IN-2V-8DO
The EDGE 4IN-2V-8DO
does not communicate
Verify if the EDGE 4IN-2V-8DO is powered up, look at the LEDs (3.3V, 5V, 13.1V) if
there are activated
Verify if the dip-switches are set correctly
Verify if there are activities on the bus communication by looking at the activities on
the Auto bus or Safe bus
Verify if the network link is installed correctly: Terminal A from modules to Main Con-
troller terminal A, Terminal B from modules to Main Controller terminal B
Verify if the network communication is installed in daisy chain
Verify if your end of line (EOL) are set correctly on your network
Verify if the network link is not cut: wire is cut or the protections are activated
Verify if there is not a short-circuit on the network link between terminal A and B
Verify if the network link length is below 4000 feet (1200m) with the recommended
gage
Measure the voltage between the terminal 24V and GND. The voltage must be at
least 16V
If the problem persists, contact AP/Cumberland or GSI Electronics
The EDGE 4IN-2V-8DO
does not power up
Verify if the EDGE 4IN-2V-8DO is powered up, look at the LEDs (3.3V, 5V, 13.1V) if
there are activated
Verify if the fuses F26, F27, F28, F38 are not burned. Find the issue and correct it
and replace the burned fuse
Measure the voltage between the terminal 24V and GND. The voltage must be at
least 18V
Verify if the power link is installed correctly: Terminal 24V from modules to Main Con-
troller terminal 24V, Terminal GND from modules to Main Controller terminal GND
890–00687
EDGE 2
107
Summary of Contents for 064-11343
Page 7: ...Chapter 1 Introduction Figure 1 2 Enclosure Identification 890 00687 EDGE 2 7...
Page 22: ...NOTES 22 890 00687 EDGE 2...
Page 30: ...Chapter 2 Pre Installation Planning 30 890 00687 EDGE 2...
Page 40: ...NOTES 40 890 00687 EDGE 2...
Page 58: ...NOTES 58 890 00687 EDGE 2...
Page 98: ...NOTES 98 890 00687 EDGE 2...
Page 112: ...NOTES 112 890 00687 EDGE 2...
Page 116: ...NOTES 116 890 00687 EDGE 2...
Page 120: ...NOTES 120 890 00687 EDGE 2...
Page 134: ...NOTES 134 890 00687 EDGE 2...
Page 135: ...F Extending a cable Best practice using a junction box 890 00687 EDGE 2 135...
Page 136: ...Appendix F Extending a cable Using of heat shrink tubing 136 890 00687 EDGE 2...