4‐35
Engine
4.
Tighten the crankcase bolts (1) in a
cross pattern in stages.
10 Nm or 7 ft lbs
5.
Apply sealant (4) to crankcase bolt
(2) And install
10 Nm or 7 ft lbs
6.
Tighten the crankcase bolts (3)
26 Nm or 19 ft lbs
Left Crankcase
Right Crankcase
Caution:
Before installing and torque is applied,
be sure to check that the transmission
is functioning properly by rotating the
shift drum manually in both directions.
Installing the shift levers
1.
Shift lever 2 assembly (1)
14 Nm or 10 ft lbs
2.
Shift lever 1 (2)
Note:
When installing the shift lever 1, align
the punch mark (a) on the shift lever 1
with the punch mark (b) on the shift
lever 2.
Summary of Contents for Challenger 550
Page 1: ...SERVICE MANUAL Challenger 550 750...
Page 53: ...550 UV Engine Specifications 2 12...
Page 54: ...550 UV Engine Specifications 2 13...
Page 94: ...Periodic Maintenance 3 29...
Page 220: ...6 11 Electrical Ignition System Circuit Diagram 1 High tension Coil 2 C D I 3 Magneto...
Page 224: ...6 15 Electrical Electric Starting System...
Page 227: ...6 18 Electrical Charging System...
Page 229: ...6 20 Electrical Lighting System...
Page 230: ...6 21 Electrical Signaling System...
Page 231: ...6 22 Electrical Cooling System...
Page 232: ...6 23 Electrical 2WD 4WD Selecting System...
Page 254: ...MY 2019 Forward Wiring...
Page 255: ...Form Number 769 12198_06...