- 29 -
Cod. 1910000001187 - nv01
English
• Remove the electric heater.
Caution: extract the heating element gently, taking care not to
scratch the inner lining of tank, coil and flange.
In case of contact with the inner wall of the tank never force the
extraction; to facilitate passage through the flange is recommended
to rotate the heating element and press its copper tubes with your
fingers in order to make closer to each other and reduce dimension.
• To replace the electrical resistance unscrew the central screw that
fixes the heating element to counter flange.
• Replace the heating element and tighten it with the central screw,
taking care to restore the sealing of gasket and verifying its integrity.
Caution: the bended heating element, once reassembled in tank,
must be directed downwards, then it should correspond to the
lower central hole of the counter-flange as shown in the image.
• Repeat the steps in reverse order to replace the heating element, the
counter flange, the thermostat, the wiring and the plastic protection,
taking care to respect the order of the connections..
5.9 Air connections
Attention: Aeraulic connections can be
installed in BOLLYTERM HP units.
Install aeraulic channels in such a way that they:
• do not burden the units with their weight
• allow unit maintenance, start-up and dismantling of any accessories
• prevent recirculation of air between suction and delivery of the machine
• are properly protected to prevent accidental intrusion of material into
the machine.
Caution:
Do not use external grilles with high pressure drop, such as anti-
insects grids. The grids used must grant a good air flow.
Load loss of the channels (including grilles and any other components) in
nominal flow conditions shall not exceed the static pressure performance
available from the unit (60Pa).
IN ANY CASE, CHANNELS MUST NOT EXCEED THE TOTAL LENGTH
OF 8 METERS WITH NO MORE THAN 4 CURVES (SUCTION AND
DELIVERY CARRIED OUT WITH SMOOTH TUBE OF DIAMETER NOT
LESS THAN 180mm).
The product performances are calculated in compliance with
the conditions laid down in the EU Regulation 812/2013
(Annex VII, table 6, 3rd column). The product can work when
the temperature of the suctioned air is between -5°C and +43°C.
Summary of Contents for Bollyterm HP
Page 10: ...10 Cod 1910000001187 nv01 ESEMPI DI CANALIZZAZIONI Italiano...
Page 22: ...22 Cod 1910000001187 nv01...
Page 30: ...30 Cod 1910000001187 nv01 English EXAMPLES OF CHANNELING...
Page 42: ...42 Cod 1910000001187 nv01...
Page 50: ...50 Cod 1910000001187 nv01 Nederlands VOORBEELDEN VAN KANALISEREN...
Page 63: ...63 Cod 1910000001187 nv01...