2DF
2-4-1
Timing c
har
t No.
1
F
rom the main s
witch turned on to mac
hine stabilization
MSW: On
MSW
FH-M
FH-S
DM
DB REM
CN31-1
CN1-5
CN1-6
CN11-9,11
CN7-1
CFM (second speed)
CFM (first speed)
PM
TC REM
CN8-12
CN7-10
500 ms
500 ms
10 s
*3
100 ms
+400 V
+3000 V
+400 V
13 s
3 s
900 ms
2 s
1000 ms
*1: Copying is enabled as follows:
1. When fixing temperature at the main switch turning on is 100
°
C/212
°
F or lower
Absolute humidity is 15 g/m
3
or higher:
Copying is enabled 120 s after fixing heater M (FH-M) turning on.
2. When fixing temperature at the main switch turning on is 100
°
C/212
°
F or lower
The fixing temperature at the main switch turning on is 13
°
C/55.4
°
F or higher and the ambient temperature is 18
°
C/64.4
°
F or higher:
Copying is enabled at the earlier timing of either 41 s after fixing heater M (FH-M) turning on or when the copier enters sec
ondary stabilization.
Other than the above:
Copying is enabled at the later timing of either 69 s after fixing heater M (FH-M) turning on or when the copier enters secon
dary stabilization.
3. Other conditions than 1 and 2
Copying is enabled when the copier enters secondary stabilization.
*2: Rotates for 180 s at full speed when the fixing temperature at the main switch turning on is 100
°
C/212
°
F or lower, and the absolute humidity is 15 g/m
3
or higher.
*3: 60 s when the fixing temperature at main switch turning on is 100
°
C/212
°
F or lower, and the absolute humidity is 15 g/m
3
or higher.
Primary stabilization
fixing temperature
110
°
C/230
°
F
Secondary stabilization
fixing temperature
165
°
C/329
°
F
Copying enabled
*1
Half speed
Half speed
Full speed
Full speed
*2
30 s
15 s
700 ms
Summary of Contents for Ri 2530
Page 59: ...2DF 1 3 39 This page is intentionally left blank...
Page 124: ...1 4 37 2DF This page is intentionally left blank...
Page 130: ...1 4 41 2DF This page is intentionally left blank...
Page 138: ...1 4 47 2DF This page is intentionally left blank...
Page 151: ...1 4 56 2DF This page is intentionally left blank...
Page 326: ...AD 63...
Page 329: ...3CX 1 1 2 1 1 2 Part names Figure 1 1 1 Duplex unit...
Page 330: ...3CX 1 1 3 1 1 3 Machine cross section Figure 1 1 2 Paper path Duplex unit...
Page 346: ...DF 78...
Page 349: ...3B5 1 1 2 1 1 2 Part names Figure 1 1 1 1 Intermediate tray 2 JAM release lever 3 Eject tray...
Page 383: ...J 1402...
Page 386: ...3B6 1 1 2 1 1 2 Part names Figure 1 1 1 1 Job separator tray 2 LED...
Page 387: ...3B6 1 1 3 1 1 3 Machine cross section Figure 1 1 2 Paper path...
Page 388: ...3B6 1 1 4 1 1 4 Drive system Figure 1 1 3 1 Gear 20 2 Gear 28 3 Gear 28 4 Eject roller gear...
Page 399: ...PF 70...
Page 401: ...1 1 2 3CC 2 4 Appendixes Timing chart No 1 2 4 1 Timing chart No 2 2 4 2 Wiring diagram 2 4 3...
Page 403: ...3CC 1 1 2 1 1 2 Parts names 1 Upper drawer 2 Lower drawer 3 Desk left cover Figure 1 1 1 3 1 2...
Page 404: ...3CC 1 1 3 1 1 3 Machine cross section Paper path Figure 1 1 2 Machine cross section...
Page 436: ...RA 1...
Page 438: ...3CP 1 1 1 1 1 1 Part names Figure 1 1 1 Switchback unit Switchback unit open close lever...
Page 439: ...3CP 1 1 2 1 1 2 Machine cross section Figure 1 1 2 Paper path Switchback unit...
Page 456: ...PF 75...
Page 458: ...1 1 2 5FF 2 4 Appendixes Timing chart No 1 2 4 1 Timing chart No 2 2 4 2 Wiring diagram 2 4 3...
Page 461: ...5FF 1 1 3 1 1 3 Machine cross section Paper path Figure 1 1 3 Machine cross section...
Page 499: ...Fax System C...
Page 501: ...1 1 2 3CM...
Page 509: ...3CM 1 1 8...
Page 553: ...3CM 1 3 40...
Page 565: ...3CM 1 5 2...
Page 570: ...3CM 2 1 2...
Page 581: ...Fax System F...