![Cooper Notification SP40S Series Installation, Testing, Operation And Maintenance Manual Download Page 57](http://html1.mh-extra.com/html/cooper-notification/sp40s-series/sp40s-series_installation-testing-operation-and-maintenance-manual_2664582057.webp)
Installation
SP40S Multi-Function Communications System
57
3.
Refer to
and place one 12 Volt battery with the battery terminals on top and
to the right. Place the second battery to the right of the first battery with the battery
terminals on top and to the left.
-
+
-
+
Short Jumper
(Supplied)
To Negative (-)
of Battery
Terminal (TB10)
on bottom of
motherboard
To Positive (+)
of Battery
Terminal (TB10)
on bottom of
motherboard
Figure 24 Battery Alignment and Jumper Connection
4.
Connect the short jumper (included) to the back terminals (negative to positive) of
the two batteries as shown in
. This connects the 12VDC batteries in series
in order to produce 24VDC.
5.
Place the batteries in the battery compartment with the battery terminals and jumper
facing “UP” or toward the top of the SP40S panel. Make sure that the red and black
battery jumpers are clear of the batteries.
6.
Attach the red and black battery wires (red to (+), black to (–)) to the proper battery
terminals.
CAUTION:
Always install the two batteries with the battery terminals pointing to the
center and in the upright position as shown in Figure 24. Failure to do so may cause a
short circuit which may damage the SP40S panel or batteries and cause the panel to fail
to operate in an emergency condition.
Summary of Contents for SP40S Series
Page 2: ...SP40S Multi Function Facility Communications System Revision M 2...
Page 4: ...SP40S Multi Function Communication System Revision M 4...
Page 8: ...SP40S Multi Function Communication System Revision M 8...
Page 10: ...SP40S Multi Function Communication System Revision M 10...
Page 12: ...SP40S Multi Function Communication System Revision M 12...
Page 81: ...Compatible Signaling Appliances SP40S Multi Function Communications System 81...