![Cooper Notification SP40S Series Installation, Testing, Operation And Maintenance Manual Download Page 56](http://html1.mh-extra.com/html/cooper-notification/sp40s-series/sp40s-series_installation-testing-operation-and-maintenance-manual_2664582056.webp)
Installation
SP40S Multi-Function Communications System
56
AC Field Wiring
(non-power limited)
LINE, GROUND
and NEUTRAL
Thread wire out
knockout on the
left side of the
enclosure.
Grounding
Terminal
Block
Figure 22 VAC Input Connection
4.9.2 Installing Batteries
NOTE:
Batteries are not supplied with the SP40S Multi-Function Facility Communication
System and must be purchased separately.
1.
Connect the supplied red battery wire to the (+) terminal and the supplied black
battery wire to the (–) terminal of TB10 (see
2.
Run jumpers along the bottom of the chassis in the battery compartment.
To Positive
(+) of battery
terminal
(Red)
To Negative
(-) of battery
terminal
(Black)
Figure 23 Battery Wire Connections
Summary of Contents for SP40S Series
Page 2: ...SP40S Multi Function Facility Communications System Revision M 2...
Page 4: ...SP40S Multi Function Communication System Revision M 4...
Page 8: ...SP40S Multi Function Communication System Revision M 8...
Page 10: ...SP40S Multi Function Communication System Revision M 10...
Page 12: ...SP40S Multi Function Communication System Revision M 12...
Page 81: ...Compatible Signaling Appliances SP40S Multi Function Communications System 81...