4-8
I
Operation
Start-up
Every unit is factory set to deliver water in accordance with the standard operating speci-
fications for that particular unit. Due to variables involved with different applications and
different installations, minor adjustments may be required during the initial start-up to
ensure proper operation. We recommend a qualified technician perform the start-up and
that they follow the start-up procedure in sequence. The following serves as a checklist for
the initial start-up and for subsequent start-ups if the unit is out of service for a prolonged
time.
WARNING: Electrical hazard
Before performing maintenance or repairs on this product, disconnect and lock
out electrical power sources to prevent injury from unexpected energization or
start-up. A lockable device must be used to isolate this product from potentially
hazardous electricity.
WARNING:
This equipment contains hot water or coolant under pressure. Accidental release
of this hot fluid may result in steam formation and can cause personal injury and
or property damage.
WARNING:
This equipment may contain fan blades or other sharp edges. Make sure all fan
guards and other protective shields are securely in place.
WARNING:
The exposed surfaces of motors, heater tubes, and other fluid circuit components
can be very hot and can cause burns if touched with unprotected hands
CAUTION:
Disconnect and lock out incoming power before installing, servic-
ing, or maintaining the equipment. Connecting power to the main terminal block
energizes the entire electric circuitry of the unit. A power supply provides 24 VDC
control power. Electric power at the main disconnect should be shut off before
opening access panels for repair or maintenance.
CAUTION:
Wear eye protection when installing, maintaining, or repairing the
equipment to protect against any sparks, debris, or fluid leaks.
CAUTION:
Wear protective gloves when installing, maintaining, or repairing
the equipment to protect against any sparks, debris, or fluid leaks.
CAUTION:
To prevent improper pump performance due to reverse rotation,
connect L1-L2-L3 in the A-B-C phase sequence.
(Continued)
Summary of Contents for Thermolator TW-P
Page 6: ...iv I Table of Contents ...
Page 12: ...1 6 I Introduction ...
Page 36: ...3 14 I ...
Page 58: ...4 22 I Operation ...
Page 72: ...5 14 I Maintenance ...
Page 128: ...E 4 I Appendix ...
Page 134: ...G 4 I Appendix ...
Page 136: ...H 2 I Appendix ...