background image

 

16 

Initial Checkout Procedure 

 

The  following  procedure  will  verify  that  the  HT-3000P  is  working  correctly.    We 

recommend that this procedure be conducted periodically to ensure proper operation of the tester.  
(A Compliance West HTT-1 function tester may also be used to verify the HT-3000P is working 
correctly.) 
The following items are needed to conduct this procedure: 

-  A three inch piece of 18 AWG insulated hookup wire with each end stripped back ½". 
-  An extra test lead with a banana plug on one end.  The other end will be clipped to the 
alligator clip end of the black test lead supplied with the HT-3000P. 

 

CAUTION 

High voltage (up to 2000 Volts AC and 2800 Volts DC) generated by the HT-
3000P is exposed during this test.  A risk of shock exists.  Exercise care when 
using the HT-3000P. 

 

Performance Test 

 

1. 

Connect the tester to a proper source of supply using the included 18 AWG power supply 
cord.  Turn the HT-3000P on. 

2. 

Turn the 

Ground Check

 switch on the rear panel to the Off position. 

3. 

Disconnect all leads. 

4. 

Push the red 

RESET

 button.  Verify the yellow 

TEST

 indicator is lit. 

5. 

Push the yellow 

TEST

 button. 

6. 

The  Tester  should  conduct  a  test  sequence.    At  the  end  of  the  test,  the 

Ground  OK

Ground Open

Full Voltage

Hipot Pass

, and red 

RESET

 LED’s should be lit. 

7. 

Turn the 

Ground Check

 switch on the rear panel to the On position. 

8. 

Verify that all test leads are disconnected from the HT-3000P. 

9. 

Push the red 

RESET

 button, then the yellow 

TEST

 button.   

10.  The tester should sound the buzzer.  The red 

Ground Open

 and red 

RESET

 LED’s should 

be lit. 

11.  Plug the supplied return test lead into the 

RETURN

 receptacle on the front panel. 

12.  Connect the banana plug end of the extra test lead from above into the grounding jack of 

the orange 

DEVICE

 receptacle.  The grounding jack is circular in shape and is located at 

the bottom of the 

DEVICE

 receptacle. 

13.  Connect the other end of the extra test lead from above to the black lead plugged into the 

RETURN

 receptacle. 

14.  Push the red 

RESET

 button and then the yellow 

TEST

 button. 

15.  The  tester  should  conduct  a  test  sequence.    At  test  termination,  the 

Ground  OK

Full 

Voltage

Hipot Pass

, and Red 

RESET

 LED’s should be lit. 

16.  Turn the 

Ground Check

 switch on the rear panel to the Off position. 

17.  Disconnect the extra test lead from the 

DEVICE

 receptacle.  The black lead should remain 

plugged into the 

RETURN 

receptacle on the front panel. 

18.  Connect one end of the hookup wire to the clip of the black lead and insert the other end 

into one of the vertical parallel slots in the 

DEVICE

 receptacle on the front panel.  

Keep 

clear of the wire while the test is in progress

19.  Push the red 

RESET

 button and then push the yellow 

TEST

 button. 

20.  The  tester  should  conduct  a  test  sequence,  terminated with a buzzer.  At test termination, 

the 

Ground OK

Ground Open

Excess Leakage

, and red 

RESET

 LED’s should be lit. 

 

 

 
 

Summary of Contents for HT-3000P

Page 1: ...HT 3000P Dielectric Withstand Tester 0 2000 Volts AC Output 0 2800 Volts DC Output Instruction Manual COMPLIANCE WESTUSA...

Page 2: ......

Page 3: ...logic controlled circuit design and ergonomic front panel and represents the latest in high voltage production line testing To fully appreciate all the features of your new meter we suggest that you t...

Page 4: ...2...

Page 5: ...and Rear Panel Features 11 Initial Checkout Procedure 16 Setting up the HT 3000P for Production Line Testing 17 Factory Settings 17 Display of Leakage Limit and Duration settings 17 Adjustment of the...

Page 6: ...ndamentals clearly and be aware that high voltage is adept and creative at completing a path to ground Instructions should include a warning against any metal jewelry Operators should not allow others...

Page 7: ...tion between the operator and the test being conducted The HT 3000P is designed to bleed the high voltage away after the test has concluded In order to ensure that any voltage present in the equipment...

Page 8: ...continuously during the test When testing with the Ground Check switch in the Off position the operator must ensure that the Test Return Lead is properly connected to exposed dead metal of the equipme...

Page 9: ...s is due to the AC voltage charging all capacitors connected between primary voltage and ground If the overall value of these capacitors cause a leakage current of more than 20 mA to flow at the desir...

Page 10: ...ntil the voltage has discharged to a safe level to protect the operator and also to ensure that there is no energy stored in the tested equipment Testing Equipment with non Standard Plugs or Pigtail O...

Page 11: ...ff by a resistor bank in the HT 3000P The voltage discharge progress is shown by the front panel meter Failure modes are shown by the front panel LED s for quick troubleshooting Convenience and testin...

Page 12: ...available by removing adjustment shafts ENVIRONMENTAL Operating Temperature 15 40 C Relative Humidity Range 0 90 non condensing GENERAL Input power requirements See rear panel for input voltage and f...

Page 13: ...ock absorbing material on all sides of the container Remove the tester from its container and place it on a test bench AC Line Voltage Requirements AC line voltage requirements for your Tester are not...

Page 14: ...11 Figure 2 Controls Indicators Connectors Model HT 3000P Front Panel...

Page 15: ...d the test will be terminated 5 Full Voltage LED If full voltage is successfully reached the Full Voltage LED will light and the high voltage duration timer starts 6 Hipot Fail LED Indicates failure o...

Page 16: ...13 Figure 3 Controls Indicators Connectors Model HT 3000P Rear Panel...

Page 17: ...ent of the High Voltage Ramp Time for this procedure 4 Test Time Adjustment Used to adjust high voltage test duration See Adjustment of the High Voltage Test Duration section for this procedure 5 Leak...

Page 18: ...15...

Page 19: ...osition 8 Verify that all test leads are disconnected from the HT 3000P 9 Push the red RESET button then the yellow TEST button 10 The tester should sound the buzzer The red Ground Open and red RESET...

Page 20: ...may light and in some instances the Ground OK LED may extinguish Passage of these tests indicates that the HT 3000P is functioning properly and that it is safe to use If the results of the performanc...

Page 21: ...ons Use this procedure if adjustment to a different ramp time within the range of 1 5 seconds is required 1 Defeat the Ground Check by turning the rear panel switch to the Off position 2 Connect the H...

Page 22: ...the rear panel turn the Test Time potentiometer As soon as the potentiometer starts turning the meter will display d and the value can be set in 1 second increments from 1 to 60 seconds 4 If tamperpro...

Page 23: ...e power switch to the I or ON position Push the RESET button The yellow TEST indicator should light indicating that the HT 3000P is ready to test 2 Connect the HTT 1 to the HT 3000P tester using the c...

Page 24: ...f time set in the Test Duration procedure If a breakdown of the insulation system between primary voltage and ground is detected the red Hipot Fail LED will light the buzzer will sound and the test wi...

Page 25: ...ssistance Phone 800 748 6224 Technical Assistance is available from Compliance West USA between the hours of 8 30 AM and 4 30 PM Pacific Time Compliance West USA 2120 Jimmy Durante Blvd Suite 118 Del...

Page 26: ...23...

Page 27: ...ad with a banana plug on one end are required to conduct the performance test The test equipment required for the calibration procedure is a DMM able to read true rms 0 2000 Vac 1 0 2800 Vdc 1 and a 3...

Page 28: ...the front panel and case with a mild solution of detergent and a damp sponge Clean dust from the PWB with clean dry low pressure 20 psi Calibration Procedure The Calibration Procedure should be perfo...

Page 29: ...r clip end to the 3 ohm resistor 3 Connect the banana plug end of the other lead to the round grounding jack of the DEVICE receptacle and the alligator clip end to the 3 ohm resistor 4 Turn the Ground...

Page 30: ...a test and using the 1000 1 voltage probe to check the meter at different voltages If the voltages are not within 2 at each voltage the voltage calibration must be performed again starting at step 1 a...

Reviews: