Overview of Installing ProLiant 2500R Server and Hardware Options
Writer:
BETTYD
Project:
Overview of Installing ProLiant 2500R Server and Hardware Options
Comments:
Rack chapter for Brenda Pereira's Guide
File Name:
G_CH04.DOC
Last Saved On:
8/2/96 10:57 AM
Servicing the I/O Tray
To gain access to the I/O tray:
1. Loosen the front plate thumb screws and extend the server from the
front of the rack.
2. Loosen the thumb screw that secures the side access panel.
CZR4-022.EPS
Figure 4-22.
Removing the rack side panel for access to the I/O tray
3. Slide the side access panel toward the back of the server.
Optional Installation Service
The installation service covers the entire hardware installation from unpacking
the components to routing the cables and running a test of the system. In the
United States, Compaq will make all of the arrangements to have the rack
system installed by qualified Guaranteed Service Providers. An order form
with pricing is available from PaqFax, the Compaq fax retrieval service.
Call 1-800-345-1518, select PaqFax, and request Document No. 4552.
Installation may also be ordered from and provided directly by Authorized
Compaq Service Providers.