![Compaq Storageworks SAN Switch 8 Installation And Hardware Manual Download Page 78](http://html1.mh-extra.com/html/compaq-storageworks/san-switch-8/san-switch-8_installation-and-hardware-manual_2646671078.webp)
6-4
Compaq StorageWorks SAN Switch 8 Installation and Hardware Guide
Compaq Confidential – Need to Know Required
Writer: Hilary Stead Project: Compaq StorageWorks SAN Switch 8 Installation and Hardware Guide Comments:
Part Number: EK-BCP24-IA / 161355-001 File Name: G-CH6 REPAIR AND REPLACEMENT.DOC Last Saved On: 9/30/99 10:31 AM
Installing the Power Supply
To install a new power supply:
1.
Slide the new power supply into its slot until the unit is flush with the
front panel.
2.
Lock the metal handle into the power supply by pushing the handle up
and locking it into place.
3.
Reattach the power cord to the power supply.
4.
Turn on the power to the switch. The switch automatically runs POST
when power is applied to the switch.
NOTE:
If you have a dual-redundant power supply configuration, the switch will only run
POST if both power supplies are turned off and then turned on.
5.
Check for error messages through Telnet.
Replacing a GBIC Module
The GBIC modules are installed and removed by sliding them into and out of
the motherboard slots on the front of the unit. GBIC modules are
hot-pluggable.
CAUTION:
The GBIC modules contain static-sensitive components. Use
electrostatic discharge (ESD) precautions while handling GBIC modules.