98-146706-A
7-1
Chapter 7
Install
ation check
Installation check
7
Now that you have installed the system, you can test it to verify it is ready for customer
delivery. Follow the check lists below to test the system for proper operation.
•
Installation check list: Antenna
•
Installation check list: ACU and modem, connectors and wiring
•
Installation check list: Functional test in harbor
SAILOR900Ka-IM-98-146706.book Page 1 Thursday, July 16, 2015 11:07 AM