Now that you have installed the system, you can test it to verify it is ready for customer
delivery. Follow the check lists below to test the system for proper operation.
•
Installation check list: Antenna
•
Installation check list: ACU, modem, connectors and wiring
•
Installation check list: Functional test in harbor
7.1 Installation check list: Antenna
Step
Task
Further information
Done
1.
Check that the antenna is free of obstructions.
See
2.
Make sure to maintain the vertical orientation
of the ADU center line.
See
3.
Check that the ADU is installed where
vibrations are limited to a minimum.
See
4.
Check that you programmed the blocking
zones correctly.
See
Blocking zones with azimuth and
and
To set up blocking zones (RX and TX)
5.
Make sure that the safety distance for radiation
hazard is kept.
See
Safe access to the ADU (radiation
6.
Check that the mounting height of the antenna
is in accordance with the ship’s min. roll period.
See
Ship motion and offset from the
7.
Make sure that the requirements for mast
foundation and height, including flatness,
gusset plates and distance from welding seams
are met.
See
ADU mast design: Mast foundation
8.
Make sure that the distances to radar, Inmarsat
systems, GPS receivers and other transmitters
are as required.
See
Interference from radar, GPS, L-
9.
Make sure that the drain tube is open and risk
for water intrusion is at a minimum.
See
Condensation, water intrusion and
10.
Check that the ADU is grounded correctly,
using the mounting bolts.
See
Table 7-1: Installation check list: Antenna
Summary of Contents for SAILOR 60 GX
Page 1: ...Cobham Public SAILOR 600 VSAT Ka SAILOR 600 VSAT Ka High Power Installation manual...
Page 116: ...Software update 8 12 Chapter 8 Service 98 148248 C Figure 8 11 Verifying software update...
Page 181: ...Telenor antenna approval G 4 Appendix G Approvals 98 148248 C...
Page 192: ...98 148248 C www cobham com satcom Cobham Public...