Power-up procedure
5-2
Chapter 5: Power and start up
98-148248-C
5.1.1 Initialisation steps in daily use
Once the system is configured and a satellite profile is active, the startup sequence is as
follows:
• ACU POST
• Antenna initializing
• Antenna SW upload (If the software versions in the ADU and ACU are not the same,
a software update is done during startup.)
• Antenna POST
• READY
• POINTING ANTENNA
• ACQUIRING SIGNAL
• TRACKING
5.1.2 SAILOR 600 VSAT Ka operational
When the display shows
TRACKING
.
MDM: NETOK
and the LED
Logon
is steady green
the system is operational.
Figure 5-1: ACU: LEDs, display and keypad (detailed, example)
Main NAV:GH MDM: NETOK LAN: 1 – 3 4
TRACKING
6$7:5;/+7;0$5
Summary of Contents for SAILOR 60 GX
Page 1: ...Cobham Public SAILOR 600 VSAT Ka SAILOR 600 VSAT Ka High Power Installation manual...
Page 116: ...Software update 8 12 Chapter 8 Service 98 148248 C Figure 8 11 Verifying software update...
Page 181: ...Telenor antenna approval G 4 Appendix G Approvals 98 148248 C...
Page 192: ...98 148248 C www cobham com satcom Cobham Public...