Installation check list: ACU, modem, connectors and wiring
7-2
Chapter 7: Installation check
98-148248-C
7.2 Installation check list: ACU, modem, connectors
and wiring
Step
Task
Verification and further information
Done
1.
Check that the grounding of the ACU is
correctly, using the mounting bolts and
washers.
See
2.
Make sure that the modem is mounted
close to the ACU (preferably next to it).
Visual inspections.
3.
Check that the ADU antenna N-connector
is properly connected with the 50 Ohm RF
cable.
Visual inspection of the bottom of the ADU. See
section
4.
Check that the ACU antenna N-connector
is properly connected with the 50 Ohm RF
cable.
Visual inspection of the connector panel of the
ACU.
5.
Check that the ACU's
Rx Out
is connected
to the modem
Rx in
using the included
1 m F-F 75 ohm cable.
Visual inspection of the connector panel of the
ACU and the modem. See the figure
6.
Check that the ACU's
Tx In
is connected
to the modem
Tx out
using the included
1 m F-F 75 ohm cable.
Visual inspection of the connector panel of the
ACU and the modem. See the figure
7.
Check that the ACU's
RS-232
is connected
to the modem using the included serial
cable.
Visual inspection of the connector panel of the
ACU and the modem. See the figure
8.
Check that the ACU's
RS-232
is connected
to the modem’s using the included serial
cable.
Visual inspection of the connector panel of the
ACU and the modem. See the figure
9.
Check that the ACU's NMEA 0183
connector is connected to the NMEA 0183
bus of the vessel using the included multi-
connector.
Visual inspection of the connector panel of the
ACU connector. See Table 4-4 on page 4-3.
10.
Check that the power cable is plugged into
the ACU and that AC power is available.
Visual inspection.
11.
Check that the AC power cable is plugged
into the modem and that AC power is
available.
Visual inspection.
Table 7-2: Installation check list: ACU, connectors and wiring
Summary of Contents for SAILOR 60 GX
Page 1: ...Cobham Public SAILOR 600 VSAT Ka SAILOR 600 VSAT Ka High Power Installation manual...
Page 116: ...Software update 8 12 Chapter 8 Service 98 148248 C Figure 8 11 Verifying software update...
Page 181: ...Telenor antenna approval G 4 Appendix G Approvals 98 148248 C...
Page 192: ...98 148248 C www cobham com satcom Cobham Public...