MOVING UNIT
1.
While still on skid, move unit as close to final
installation position as possible.
2.
Prepare unit for lifting as shown in diagram.
3.
Lift gently with a forklift or jacks and remove skid.
4.
Lower gently to ground and remove forklift and
blocking.
5
.
If unit has to be re-positioned, slide gently. Do not
twist or push one side of unit excessively and
cause binding on trunnions.
Shim as
required
to make
level with
center
console
(front
and back)
4"x4" or larger
(front and back)
Forklift tongs
Skid
Flanged feet
Jack
LEVELING
Recommended Leveling Procedure
1.
With straight-edge, line the backs of the consoles
up with each other (dotted line
A
).
2.
Level and straight-edge backs of consoles (dotted line
B
). Adjustments are made by turning flanges on back
feet only.
3.
Level consoles individually from front to back (dotted
lines
C
). Adjustments are made by turning flanges on
front feet only.
4.
Re-check that the back is level (dotted line
B
) and
then the front (dotted line
D
). Adjust if necessary.
5.
Check that mixer bridge is level and
guide pins lock smoothly without binding. If
not repeat steps
1
through
4
.
Guide Pins
NOTE:
See Operating Instructions before operating
unit.
6.
Make electrical connections (see electrical service
connections) and test mixer bridge as follows:
⇒
A/
Raise mixer bridge.
⇒
B/
Swing bridge out over centre console.
B
A
C
D
B
A
C
D
C
C
C
C
Recommended Installation Procedure
Note:
Instructions reflect a more complicated twin mixer kettle - process for single mixer kettles is the same.