91
FieldSmart
®
Fiber Active Cabinet (FAC) 400
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020419 REV A - Feb 2019
Install the protective covers (manufacturer-supplied) over the battery terminals.
Connect the string of batteries to the power system by plugging the battery string and the rectifier system out
-
put Anderson connectors together.
Re-install the rectifier module removed in step 8.
Verify that the cabinet heat exchanger fans are running (if the temperature is high enough).
At the AC load center, do the following:
a.
Set the Main breaker to OFF. The heat exchanger fans should continue to run.
b.
Set the Main breaker to ON and verify that power restores to the Alpha shelf.
Slide the battery string into the battery tray.
Install the lower retainer as follows:
a.
Slide the lip of the retainer flush against the bottom edge of the compartment, and then align the holes at the
right and left ends of the retainer with the counterpart mounting holes on the compartment.
b.
Tighten the thumb screws on the compartment to secure the retainer in place.
Note:
If you are using the optional seismic protection kit, install the front seismic bracket and stiffener above
the lower retainer.
Replace the battery compartment door.
Step 10:
Step 11:
Step 12:
Step 13:
Step 14:
Step 15:
Step 16:
Step 17: