101
FieldSmart
®
Fiber Active Cabinet (FAC) 400
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020419 REV A - Feb 2019
Terminate the protection block interface cables as follows:
a.
Route the two RJ-21 equipment interface cables from the back of the block to the active service unit and
connect to the appropriate equipment interfaces (RJ-21 connectors).
b.
Route the two MS2 or 710 subscriber interface cables to the back and mate to the appropriate OSP
interface cables (MS2 or 710 connectors).
c.
Dress and secure the interface cables with cable ties as needed.
Apply line identification labels over the dead pair positions (25 and 50) on the protection block.
• Use the blue labels to identify the xDSL or combo lines.
•
If applicable, use the green labels to identify overlay POTS lines (to PSTN).
Repeat Steps 1–4 to install additional protection blocks for lines served, as needed.
Step 3:
Step 4:
Step 5: