Unpack the generator connector assembly from the shipping package.
Note:
The connector ships pre-assembled in a mounting housing.
Attach the generator connector assembly to the mounting fixture as follows:
a.
From inside the battery base, insert the connector plate cover through the mounting fixture, and align the
four studs on the housing with the counterparts holes in the fixture.
b.
Install the four nuts onto the four studs and tighten the nuts to secure the assembly in place.
Connect the generator connector wires to the AC load center as follows:
a.
Remove the locking nut from the conduit, and set aside.
b.
Route the conduit with the Gen Conn wiring up into the AC load center (though the hole directly below the
breaker space labeled Gen Conn) and attach the locking nut from inside of the AC load center to the conduit
fitting by tightening it clockwise.
Terminate the generator connector wires to the load center as follows:
• Connect the ground (green) lead to the ground bus bar.
• Connect the neutral (white) lead to the neutral bar.
• Connect the L1 (black) lead to the left side of the Gen Conn breaker.
• Connect the L2 (red) lead to the right side of the Gen Conn breaker.
Note:
An AC wiring label is attached behind the load center front panel for reference.
Replace the AC load center cover panel.
At the AC load center, switch all breakers to ON.
At the local power transfer switch, restore AC power to the cabinet.
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Step 6:
Step 7: