FieldSmart
®
Fiber Active Cabinet (FAC) 400
Installation Manual
_________________________________________________________
Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
20
Cabling Requirements
Cables supplied to the cabinet must meet the following minimum requirements.
Note:
Local climatic conditions, site conditions, or local practices may require adjustments to cabling requirements.
Function
Facility
Requirements
Power
Ground
Copper
6 AWG solid bare copper wire (to earth ground circuit);
terminates to ground bar with screw lug
AC
(local power)
Copper
8–10 AWG stranded copper; Follow National Electric Code (NEC) and local codes