FieldSmart
®
Fiber Active Cabinet (FAC) 400
Installation Manual
_________________________________________________________
Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
74
Install a user-supplied AC conduit into the battery compartment, between the outside entry duct (in the
compartment floor) and the load center entry location (in the compartment ceiling). Install the conduit per local
practice. Make sure the conduit is rated for AC cabling.
Pull the AC wires (8–10 AWG) into the cabinet through the entry duct in the battery compartment and up into
the AC load center.
Connect the AC wires to the load center:
• Connect the ground (green) lead to the ground bus bar.
• Connect the neutral (white) lead to the neutral bar.
• Connect the L1 (black) lead to the left side of the Main breaker.
• Connect the L2 (red) lead to the right side of the Main breaker.
Note:
An AC wiring label is attached behind the load center front panel for reference.
Tighten the coupling nut around the AC wires at the bottom of the load center housing.
Re-install the cover panel on the AC load center.
Step 4:
Step 5:
Step 6:
Step 7:
Step 8: