EXIT TO DISPLAY SCREENS
Con
fi
guring the Control Valve for System Controller Operation:
Select “SYS” to link control valve to System Controller. For communication between control valve and
System Controller, a three-wire communication cable is required.
Selection requires that a connection to a Clack No Hard Water Bypass (V3070FF or V3070FM) be made
to the two-pin connector labeled MAV located on the printed circuit board for WS1 and WS1.25 control
valves. For valve types WS1.5 and WS2, a connection from a Clack No Hard Water Bypass (V3097/
BSPT or V3098/ BSPT) to the two pin connector labeled MAV located on the printed circuit board is
required.
Press NEXT to go to Step 6CS. Press REGEN to return to previous step.
Step 6CS
Step 6CS –
Water Hardness Units. The choices are:
ppm parts per million
FH French degrees
dH German degrees
NOTE: If control is going to be used in a
fi
lter application none of these settings will be used.
Press NEXT to go to Step 7CS. Press REGEN to return to previous step.
Step 7CS
Step 7CS –
Fill Units: If set as a softener, if Step 2CS is set to 1.5, and FILL is part of the Regeneration
Cycle Sequence, FILL UNITS of MIN or kg can be selected. Press
NEXT to exit OEM Con
fi
guration Setup. Press REGEN to return to
previous step.
Summary of Contents for Water Specialist EI
Page 1: ...Water Specialist EI Control Valve Programming and Cover Drawing Manual...
Page 2: ...Page 2 EI Manual...
Page 20: ...Page 20 EI Manual...
Page 21: ...EI Manual Page 21...
Page 22: ...Page 22 EI Manual...
Page 24: ...Page 24 EI Manual Form No V3435EI 8 24 2017 U S Patents 6 402 944 6 444 127 6 776 901...