C H A P T E R
2-1
Cisco VG248 Analog Phone Gateway Hardware Installation Guide
78-13154-01
2
Preparing to Install the VG248
To ensure normal system operation, plan your site configuration and prepare your
site before installation.
Before installing the VG248, review these sections:
•
Preparing the Installation Site, page 2-1
•
Rack-Mounting the System, page 2-3
•
AC Power Considerations, page 2-5
•
Preventing ESD, page 2-6
•
Installing, Servicing, or Disposing the System, page 2-6
•
Network Requirements, page 2-8
•
Required Tools and Cabling, page 2-8
•
Safety, page 2-8
Preparing the Installation Site
Refer to these guidelines to prepare the installation site:
•
Choosing a Site for Installation, page 2-2
•
Ensuring Overcurrent Protection, page 2-2
•
Grounding the System, page 2-3
•
Creating a Safe Environment, page 2-3