30
SVGm
Instruction Manual
3�7�2�- 4-WIRE CONNECTION AND CURRENT MEASUREMENT ON THE LOAD SIDE�
N
L1
L2
L3
CARGA / LOAD
L1 L2 L3
RED/ MAINS
S1 S2 S1 S2 S1
S2
L1
P1
P2
L2
L3
P1 P2P1 P2
S1
S2
P1
P2 S1
S2
P1
P2 S1
S2
P1
P2
N N
Figure 23: Three-phase measuring with 4-wire connection and current measurement on the load side�
Use the 2 neutral current terminals, as
In
can be: In ≈ 3 * I
PHASE
Summary of Contents for SVGm-3WF-100C-480
Page 1: ...SVGm M248B01 03 21A Static var generator INSTRUCTION MANUAL ...
Page 2: ...2 SVGm Instruction Manual ...
Page 98: ...98 SVGm Instruction Manual 14 CE CERTIFICATE ...
Page 99: ...99 Instruction Manual SVGm ...
Page 100: ...100 SVGm Instruction Manual ...
Page 101: ...101 Instruction Manual SVGm ...