BGS3 Hardware Interface Description
Figures
7
BGS3_HD_v01.000d
Page 7 of 109
2010-03-26
Confidential / Released
Figures
Power supply limits during transmit burst....................................................... 24
Position of reference points BATT+and GND ................................................ 25
Powerup with operating voltage at BATT+ applied before activating IGT...... 27
Powerup with IGT held low before switching on operating voltage at BATT+ 28
Timing of IGT if used as ON/OFF switch ....................................................... 29
Signal states during turn-off procedure.......................................................... 33
Timing of CTSx signal (if CFUN= 7)............................................................... 45
Timing of RTSx signal (if CFUN = 9).............................................................. 45
Line input configuration with OpAmp ............................................................. 55
Slave PCM Timing, Short Frame selected ..................................................... 60
Slave PCM Timing, Long Frame selected...................................................... 60
4 layer PCB stack for BGS3 interface board.................................................. 65
RF line on interface board. All dimensions are given in mm .......................... 67
Numbering plan for connecting pads (bottom view)....................................... 72
Dimensions of BGS3 (all dimensions in mm)................................................. 92
Recommended stencil design (bottom view) ................................................. 94
Moisture barrier bag (MBB) with imprint....................................................... 100
BGS3 sample application............................................................................. 104
Reference equipment for Type Approval ..................................................... 105