19
Figure 3-6b 100/125kW Centralized Wire-box Bracket Mounting Pattern
100/125kW Standard Wire-box
100/125kW Centralized Wire-box
Figure 3-7 Left and Right Wall Brackets Combination
INSTRUCTION:
Before installing the brackets, first connect the left and right wall
mounting brackets with 2 PCS M8 flange nuts (
See Figure 3-7)
(torque 12.5 Nm (110 in-lbs))
Summary of Contents for CPS SCH Series
Page 2: ......
Page 4: ......
Page 43: ...39 Figure 3 25 AC Output Cable Connection Distributed Wire box L1 L2 L3 ...
Page 45: ...41 Figure 3 27 AC Output Cable Connection Centralized Wire box Ver 2 ...
Page 58: ...54 Figure 4 1 System setting ...
Page 81: ...77 5 4 2 6 Others The REF column is reference to Table 5 7 Enable functions ...