24
B.
Aligning the mark on the wire-box with the bracket (
Figure 3-15
),
hang the wire-box on the right side of the wall bracket. Push the
wire-box left to its final position meeting the main inverter
enclosure.
Figure 3-15 Wire-box Position
C.
Connect the wire-box to the main enclosure, using the
M8
Flanged Nut
(4pcs) (torque: 12.5Nm (110.6 in-lbs). Secure the
wire-box to the bracket with
M6x18
combination screw (torque:
6Nm (53 in-lbs)) (
Figure 3-16
).
This connection provides the
ground bond for the Inverter (Main) Enclosure. Failure to
properly install may result in shock or equipment failure.
Figure 3-16 Installation of the Wire-box
Summary of Contents for CPS SCH Series
Page 2: ......
Page 4: ......
Page 43: ...39 Figure 3 25 AC Output Cable Connection Distributed Wire box L1 L2 L3 ...
Page 45: ...41 Figure 3 27 AC Output Cable Connection Centralized Wire box Ver 2 ...
Page 58: ...54 Figure 4 1 System setting ...
Page 81: ...77 5 4 2 6 Others The REF column is reference to Table 5 7 Enable functions ...