5. Check that the 24V battery supply is
connected to the controller.
Ensure that the battery polarity is
correct.
6. Switch on the mains supply (via isolator).
7. Check that the
green
charger LED on the
controller lights up.
Control card setup
8. Select dipswitch settings to give required
Mode of Operation.
page 28
Summary of Contents for BENINCA IT24N
Page 1: ...UNDERGROUND SWING GATE OPERATOR IT24N BENINCA installation manual IT24N...
Page 44: ...Notes...
Page 45: ...Notes...
Page 46: ...Notes...
Page 47: ...Notes...