page 23
Secure control box to wall
1. Always check that the circuit breaker in the electrical panel is in the OFF
position, and that all high voltage circuits (more than 42.4V) are
completely isolated from the mains supply before doing any work.
2. Ensure that all low voltage systems (less than 42.4V) are suitably
protected from damage, by disconnecting all sources of power such as
chargers and batteries before doing any work.
3. All electrical work must be carried out according to the requirements of
all applicable local electrical codes. (It is recommended that a licensed
electrical contractor perform such work.)
1. Secure control box to the wall using the most
appropriate means.
FIGURE 26
FIGURE 27
Preferably mount the wall box:
• Out of direct sunlight
• At a comfortable working height
• Away from garden sprinklers etc.
• To allow easy access even when the
gate is open
Be sure to position the wall box so as
not to cause any hazards during and
after the installation.
Connect all wiring
2. Connect all cables as required to the control card and battery charger, according to the wiring
diagrams under Section 10, 11 and 12.
Radio
receiver
10. Electrical setup
Summary of Contents for BENINCA IT24N
Page 1: ...UNDERGROUND SWING GATE OPERATOR IT24N BENINCA installation manual IT24N...
Page 44: ...Notes...
Page 45: ...Notes...
Page 46: ...Notes...
Page 47: ...Notes...