16.3.1. Concreting the Assembly into the Trench.
Place the assembly in the trench and level the assembly using any type of propping or
jacking method. Make sure that the top of the assembly is either in line with or a little
higher than the ground level and pour concrete (minimum 45MPa after 28 days) into the
cavity that remains.
Do not pour any concrete into the gutter of the spikes module or drive
link assembly.
Remaining
Trench cavity
Remaining
Trench cavity
100mm
CONCRETE FOUNDATION
Top Structure
Ground
level
FIGURE 44
STEP 3
LHS FLUSH MOUNT - OPPOSING DIRECTION OF TRAVEL
SECTION 16
FIGURE 45. OVERVIEW OF CIVIL LAYOUT
The Value of ‘X’ in a:
3m Con
fi
guration
: 3 420mm
4.5m Con
fi
guration
: 4 920mm
6m Con
fi
guration
: 6 420mm
Dimension X
400mm
400mm
Road
Cavity
CLAWS Flush Mount Installation
Curb
Summary of Contents for CLAWS
Page 51: ...page 51 www centsys com Notes...
Page 69: ...page 69 www centsys com Notes...
Page 87: ...page 87 www centsys com Notes...