page 136
www.centsys.com
STEP 5
Repeat this coupling process for additional spike modules. Once all shafts have been
coupled, check that they move freely.
Tighten
Grub Screws
The length of the PVC conduit will be relative to the length of the spike
modules combined. Ensure that a further 38mm is added to this to account for
the modules and coupling (Refer to Section 15, Figure 26).
Far end
of the
assembly
Drive linkage
end of the
assembly
20mm PVC
Conduit
15.2.4. Proximity sensor installation
FIGURE 23
FIGURE 25
FIGURE 24
STEP 6
STEP 1
STEP 7
LHS FLUSH MOUNT - SIMILAR DIRECTION OF TRAVEL
SECTION 15
Summary of Contents for CLAWS
Page 51: ...page 51 www centsys com Notes...
Page 69: ...page 69 www centsys com Notes...
Page 87: ...page 87 www centsys com Notes...