STEP 5
Repeat this coupling process for additional spike modules. Once all shafts have been
coupled, check that they move freely.
Tighten
Grub Screws
The length of the PVC conduit will be relative to the length of the spike
modules combined. Ensure that a further 38mm is added to this to account for
the modules and coupling (Refer to Section 14, Figure 26).
Far end
of the
assembly
Drive linkage
end of the
assembly
20mm PVC
Conduit
14.2.4. Proximity sensor installation