13. Estop Coil Wiring
2. Estop coil circuit with pendant
3. Testing Estop Coil Wiring
Power up your system to test the etop contactor wiring. Start
the CNC11 software by double clicking on the CNC11 Mill icon on your desktop. After the
MPU11 has initialized, press F10 to continue to the main screen.
Press your Estop switch in and then release it
Observe the estop contactor engages
when the Estop switch is released and disengages when Estop is pressed.
Power off the system and proceed to section 14 “Wiring 3
rd
Party Servo Amplifiers to the
GPIO4D ”