6. Configuring CNC11 For Bench Testing
2. Home Configuration, Max Spindle and Disable Jog Panel Communication Faults
For
Bench Testing, set Max spindle to 3000 and set the home configuration to “Jog”. Also, the
optional Jog Pendant is not connected for Bench Testing, to disable Jog Panel
Communication faults. To change these, go to the “Control Configuration Screen”, use the
arrow keys to select “Machine Home at Powerup” and “Jog Panel Required” respectively
and, when selected, press the space bar to toggle the selections as shown below and press
F10 to save.
To navigate to “Control Configuration” from the main screen press:
F1-Setup->F3 -Config (pw = 137)->F1 Contrl
fig 6.2
After Saving, Press escape to go back to the Main Screen, press F10-Shutdown,
press F2 Power Off, and then power off the MPU11 and GPIO4D. Wait 30 seconds and
power everything back up.
3. Disable PLC faults for Limit Switches, Lube, Spindle, Estop and Axis Faults.
At the
main screen press the alt and i keys simultaneously to bring up the real-time I/O display.
Using the arrow keys, move the selection box to the top left LED Ax1_MinusLimitOk (input1)
and press the ctrl alt and i keys simultaneously to invert this input. You will notice that the
LED will turn from red to green and a line will be drawn over the top to indicate that it the
state of the input has been programmatically inverted. Repeat the process until inputs 1-11
and inputs 17-20 are green as shown below.