86
Step 37: Slide Support Assembly
Part 5
I:
Place (0826) Short Upright, from Step 37.1, under the bottom section of the slide, in the rails between
emboss #1 and #2, as shown in fig. 37.9 and 37.10. (0826) Short Upright must be plumb. Mark location on the
ground then remove the board.
J:
Dig one, flat bottom, 8” wide by 6” deep hole as previously done in Step 37, Part 2. Place (0826) Short
Upright in the hole, making sure that it is still plumb. (fig. 37.10)
K:
Refill hole halfway with soil and compact making sure (0826) Short Upright stays plumb. Finish filling and
compacting. (fig. 37.10)
Fig. 37.9
Fig. 37.10
Bottom
Section
Emboss #1
Emboss #2
Emboss #3
View From Under
Bottom Section
0826
0826
Rail