83
Step 37: Slide Support Assembly
Part 2
Fig. 37.3
Fig. 37.4
B:
At the end of (2175) SL Brace dig one, flat bottom, 8” wide by 6” deep hole as shown in fig. 37.3 and 37.4.
Place (2256) SL Upright in the hole, making sure that it is plumb. Notice the angled edge slopes towards
(2175) SL Brace. (fig. 37.3)
WARNING:
Digging can be dangerous if you do not check
first for underground wiring, cables or gas lines.
2256
6”
2175
2175
Fort
Top View
8” Wide
Angled edge of (2256)
SL Upright slopes
towards SL Brace