SECTION 2 - CONTROLS, INSTRUMENTS AND OPERATION
2ï4
5
The plunger moves the charge flake back and
compresses it against the bale to be formed in the
bale chamber. Both bale chamber side doors (6) and
top door (5) are hinged and can move under the
action of two density cylinders (8). This is to modify
the outlet section of the bale chamber and thus to
control the density of the bales produced. An
electronic system measures the load on the plunger
when pushing material rearwards. The electronic
system will control the hydraulic bale density system
until the load measured is the same as the density
value pre-set by the operator. That value must be
chosen in relation to the nature and to the moisture
content of the crop to be baled, as well as the bale
density required.
While the bale travels rearward in the bale chamber,
it activates bale length metering wheel (4). When the
desired bale length is reached, a mechanism will trip
knotters (3) and needles (9), which are timed with
baler plunger (1).
6
At each side of the machine, twine balls are provided.
Twine will be fed to the tucker twine arms, located
above the bale chamber, and to needles (9), located
underneath the bale chamber.
During the compression stroke of plunger (1), needles
(9) will raise towards knotters (3), bringing along the
lower twine (Fig. 6).
When the needles reach the knotters they will also
pick-up the upper twines. Both twines are laid in the
knotter (Fig. 7), tied together and the ends are cut to
finish the bale (Fig. 8).
7
Summary of Contents for 84336239
Page 33: ...Table of Contents xxvii ...
Page 34: ......
Page 84: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï26 One next to the service ladder 43 ...
Page 86: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï28 46 ...
Page 91: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï33 MONITORS 55 56 57 58 ...
Page 134: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï76 FIELD SETTINGS 163 164 165 166 ...
Page 137: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï79 MEMORY 169 170 171 172 ...
Page 166: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï108 Knotter 230 231 232 233 ...
Page 177: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï119 NOTE ...
Page 178: ......
Page 179: ......