Pre-Start-Up Checklist for 48/50N-Series Packaged Rooftop
(Remove and use for job file)
I. Project Information
Job Name __________________________________________________________________________________________________
Address ____________________________________________________________________________________________________
City ___________________________________________________________ State ____________________ Zip ______________
Installing Contractor ________________________________________________________ Phone ___________________________
Equipment tag / Mark for ______________________________________________________________________________________
Sales Office _________________________________________________________________________________________________
Pre-Start-up Performed by _____________________________________________________ Phone __________________________
Unit Model (18 Chars) ____________________________________________ Serial (10 Chars) ____________________________
Design Information
II. Prestart-Up
Is there any physical damage?
No
Yes If yes, has the trucking company been contacted?
Yes
No
Description _________________________________________________________________________________________________
___________________________________________________________________________________________________________
Verify that all packing materials have been removed from unit
Verify installation of economizer hoods per installation instructions
Verify installation of condensate drains and traps per installation instructions
Verify watertight interface between unit and curb (roof-mounted units)
Verify removal of supply fan shipping brackets per installation instructions
Verify removal of return fan shipping brackets (if equipped) per installation instructions
Verify compressor mounting bolt torque is 7 to 10 ft-lb. (9.5 to 13.5 n-m)
Verify installation of ductwork to unit or curb per installation instructions
Verify clearances around unit per installation instructions
Verify that power supply agrees with the unit nameplate
Verify that electrical power wiring is installed properly per installation instructions
Verify that unit is properly grounded per NEC/ETL
Verify installation of electrical disconnect per installation instructions
Verify that electrical circuit protection has been sized and installed properly per NEC/ETL
Verify that all terminals are tight
Verify that all plug assemblies are tight
Inspect all cables and thermistors for crossed wires and correct as needed
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec
-
tions of this Controls, Start-Up, Operation, Service and Trouble
-
shooting document.
Supply Airflow
(CFM)
External Static
Pressure (ESP)
Return Air Temperature (RAT)
Supply Air
Temperature
Condenser
Entering Air
Temperature
Dry Bulb (DB)
Wet Bulb (WB)
Summary of Contents for WeatherExpert 48N2
Page 135: ...135 Fig 18 48 50N Typical Power Schematic Nominal 075 Ton Unit Shown ...
Page 136: ...136 Fig 19 48 50N Typical Power Schematic Nominal Ton 90 150 Units Shown ...
Page 137: ...137 Fig 20 48 50N Main Base Board Input Output Connections ...
Page 138: ...138 Fig 21 48 50N RXB EXB CEM Input Output Connections a48 9307 ...
Page 139: ...139 Fig 22 48 50N EXV SCB Input Output Connections a48 9308 ...
Page 140: ...140 Fig 23 48N Typical Modulating Gas Heat Unit Control Wiring ...
Page 141: ...141 Fig 24 50N Typical Electric Heat Unit Control Wiring ...
Page 144: ...144 Fig 27 48N Typical Gas Heat Section Wiring Nominal Ton 120 to 150 Units ...
Page 145: ...145 Fig 28 48 50N Typical Power Component Control Wiring 460 v ...
Page 146: ...146 Fig 29 48 50N Component Control Wiring 575 v Nominal Ton 075 to 150 Units ...
Page 147: ...147 Fig 30 48 50N Component Arrangement Power Box ...
Page 148: ...148 Fig 31 48 50N Component Arrangement Control Box ...
Page 240: ...240 APPENDIX D VFD INFORMATION CONT Fig G VFD Bypass Wiring Diagram WHEN USED ...