![Campbell CR6 Series Operator'S Manual Download Page 339](http://html.mh-extra.com/html/campbell/cr6-series/cr6-series_operators-manual_489096339.webp)
Section 7. Installation
339
ii. Select a 1% resistor for R2 with a resistance that is approximately
equal to the resistance of the PRT at 10 °C. See
Procedure Information
(PT100 BrFull() Full Bridge)
(p. 349).
Since a 103.9 Ω resistor is hard to
find, use a 100 Ω resistor. It is close enough. Use 5 ppm/°C resistors.
Frequently, all the resistors in a full bridge are submerged in the medium
to be measured, so they may see large temperature changes. 5 ppm
resistors are more thermally stable than 10 ppm resistors.
2. Wire circuit to datalogger:
Use
FIGURE: PT100 BrFull() Four-Wire Full Bridge Schematic
(p. 338)
as the
wiring diagram.
3. Calculate excitation voltage:
Use the following equation to calculate the best excitation voltage (VX) for
the measurement range –40 to 60 °C. The equation reduces the absolute
result by 1% to allow for resistor inaccuracy:
VX
max
= (VS
max
/ ((RS
max
/ (RS
max
+ R4)) –
(R2 / R1 + R2))) • 0.99
where,
VS
max
= 200 mV (maximum voltage in the
±
200
input range)
R1 = 5000000 mΩ (5 kΩ)
R2 = 100000 mΩ (100 Ω)
R4 = 5000000 mΩ (5 kΩ)
RS
max
= 123240 mΩ (PT100 at 60 °C)
2
so,
VX
max
= 44972562111243 mV
4. Calibrate the PT100:
If the PRT accuracy specification is good enough, and you trust it, assume
RS
0
= 100000 mΩ. Otherwise, do the following procedure:
a. Enter
Summary of Contents for CR6 Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 76: ...Section 5 Overview 76 FIGURE 20 Half Bridge Wiring Example Wind Vane Potentiometer ...
Page 80: ...Section 5 Overview 80 FIGURE 23 Pulse Input Wiring Example Anemometer ...
Page 136: ......
Page 454: ...Section 8 Operation 454 FIGURE 104 Narrow Sweep High Noise ...
Page 459: ...Section 8 Operation 459 FIGURE 106 Vibrating Wire Sensor Calibration Report ...
Page 535: ...Section 8 Operation 535 8 11 2 Data Display FIGURE 121 CR1000KD Displaying Data ...
Page 537: ...Section 8 Operation 537 FIGURE 123 CR1000KD Real Time Custom ...
Page 538: ...Section 8 Operation 538 8 11 2 3 Final Storage Data FIGURE 124 CR1000KD Final Storage Data ...
Page 539: ...Section 8 Operation 539 8 11 3 Run Stop Program FIGURE 125 CR1000KD Run Stop Program ...
Page 541: ...Section 8 Operation 541 FIGURE 127 CR1000KD File Edit ...
Page 546: ......
Page 552: ......
Page 610: ...Section 11 Glossary 610 FIGURE 137 Relationships of Accuracy Precision and Resolution ...
Page 612: ......
Page 648: ......
Page 650: ......
Page 688: ......
Page 689: ......