Section 7. Installation
338
Notes
•
The three-wire half-bridge compensates for lead-wire resistance by
assuming that the resistance of wire
a
is the same as the resistance of
wire
b
(see
FIGURE: PT100 BrHalf3W() Three-Wire Half-Bridge
Schematic
(p. 334))
. The maximum difference expected in wire resistance
is 2%, but is more likely to be on the order of 1%.
•
The average resistance of 22 AWG wire is 16.5 Ω per 1000 feet, which
would give
500 ft lead wires (for example) a nominal resistance of 8.3 Ω.
Two percent of 8.3 Ω is 0.17 Ω. Assuming that the greater resistance is
in wire
b
, the resistance measured for the PRT in the ice bath (RS0) is
100.17 Ω, and the resistance at 40 °C (RS) is 115.71 Ω.
•
At 40 °C, because of the error from wire
b
, the measured ratio RS/RS0 is
1.1551 while the ratio without the error would be 115.54/100 = 1.1554.
As a result, the temperature computed by
PRTCalc()
from the ratio with
the error is about 0.43 °C higher than the temperature measured without
the error from wire
b
. This source of error does not exist in a four-wire
half-bridge configuration.
7.7.17.5
Example: 100 Ω
PRT in Four-Wire Full Bridge with Voltage
Excitation (PT100 / BrFull() )
FIGURE 73: PT100 BrFull() Four-Wire Full-Bridge Schematic
Procedure
1. Build circuit
1
:
a. Use
FIGURE: PT100 BrFull() Four-Wire Full-Bridge Schematic
(p. 338)
as a
template.
b. Choose a 1%, 10 ppm/°C, 5000000 Ω (5 kΩ) resistors for R1 and R4
c. Balance the bridge.
i. Find the midpoint of the temperature range. The range of –40 to 60
°C is selected for this procedure, so the midpoint is 10 °C.
Summary of Contents for CR6 Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 76: ...Section 5 Overview 76 FIGURE 20 Half Bridge Wiring Example Wind Vane Potentiometer ...
Page 80: ...Section 5 Overview 80 FIGURE 23 Pulse Input Wiring Example Anemometer ...
Page 136: ......
Page 454: ...Section 8 Operation 454 FIGURE 104 Narrow Sweep High Noise ...
Page 459: ...Section 8 Operation 459 FIGURE 106 Vibrating Wire Sensor Calibration Report ...
Page 535: ...Section 8 Operation 535 8 11 2 Data Display FIGURE 121 CR1000KD Displaying Data ...
Page 537: ...Section 8 Operation 537 FIGURE 123 CR1000KD Real Time Custom ...
Page 538: ...Section 8 Operation 538 8 11 2 3 Final Storage Data FIGURE 124 CR1000KD Final Storage Data ...
Page 539: ...Section 8 Operation 539 8 11 3 Run Stop Program FIGURE 125 CR1000KD Run Stop Program ...
Page 541: ...Section 8 Operation 541 FIGURE 127 CR1000KD File Edit ...
Page 546: ......
Page 552: ......
Page 610: ...Section 11 Glossary 610 FIGURE 137 Relationships of Accuracy Precision and Resolution ...
Page 612: ......
Page 648: ......
Page 650: ......
Page 688: ......
Page 689: ......