Page 7 of 110
Figure 33: Horizontal Polarization – Screws Location ............................................................. 82
Figure 34: Vertical Polarization – Radio and Installation and Alignment Kit .......................... 83
Figure 35: Vertical Polarization – Screws Location ................................................................. 83
Figure 36: Azimuth Screws – Top View (Azimuth 45° to the Right) ........................................ 87
Figure 37: Removing the Azimuth Screws (Side View) ............................................................ 87
Figure 38: Azimuth Screws in New Placement – Top View (Azimuth 45° to the Right) .......... 88
Figure 39: Repositioning the Azimuth Screws (Side View) ...................................................... 89
Figure 40: Horizontal / Vertical Pole ....................................................................................... 93
Figure 41: Horizontal Polarization ........................................................................................... 97
Figure 42: Vertical Polarization ............................................................................................... 97
Figure 43: PTP 820STwist Orientation ................................................................................... 109
Summary of Contents for PTP 820E
Page 1: ......
Page 44: ...Page 44 of 110 1 Secure the cable to the gland using a tie wrap ...
Page 47: ...Page 47 of 110 8 Tighten the gland cap 9 Secure the cable to the gland with a tie wrap ...
Page 53: ...Page 53 of 110 4 Tighten the gland cap 5 Secure the cable to the gland using a tie wrap ...
Page 63: ...Page 63 of 110 Note For this type of installation a 2RU space is required ...
Page 71: ...Page 71 of 110 Figure 24 V 45 Polarization B on Top Figure 25 Vertical Polarization ...