Place the mounting kit in front of the 4 anchor screws and tighten the 4 M8 screws, spring washers, and flat
washers to secure the mounting device to the wall.
Attaching the PTP 820E to the Installation and Alignment Device
1.
Connect the PTP 820E unit to the installation and alignment device, using the two M8 screws and washers
supplied with the installation and alignment kit. Attach the PTP 820E according to the desired polarization, as
shown in the figures below. Note that:
•
For vertical polarization, the upper screw must be approximately 2:00 to the right, the lower screw must
be approximately 8:00 to the left, and the RSL interface should be at approximately 9:00 to the left.
•
For horizontal polarization, the upper screw must be approximately 10:00 to the left, the lower screw
must be approximately 4:00 to the right, and the RSL interface should be at the bottom.
Figure 32: Horizontal Polarization – Radio and Installation and Alignment
Kit
Figure 33: Horizontal Polarization – Screws Location
Summary of Contents for PTP 820E
Page 1: ......
Page 44: ...Page 44 of 110 1 Secure the cable to the gland using a tie wrap ...
Page 47: ...Page 47 of 110 8 Tighten the gland cap 9 Secure the cable to the gland with a tie wrap ...
Page 53: ...Page 53 of 110 4 Tighten the gland cap 5 Secure the cable to the gland using a tie wrap ...
Page 63: ...Page 63 of 110 Note For this type of installation a 2RU space is required ...
Page 71: ...Page 71 of 110 Figure 24 V 45 Polarization B on Top Figure 25 Vertical Polarization ...