Page 65 of 110
2.
Connect the azimuth and elevation adjusters with two sets of M10x30 bolts, nuts, spring washers, and flat
washers. Do not tighten the bolts at this point in the installation.
3.
Insert two M10x130 bolts on the azimuth adjuster.
4.
Remove the nuts, spring washers, flat washers, and square cushion block from the azimuth adjuster bolt.
Summary of Contents for PTP 820E
Page 1: ......
Page 44: ...Page 44 of 110 1 Secure the cable to the gland using a tie wrap ...
Page 47: ...Page 47 of 110 8 Tighten the gland cap 9 Secure the cable to the gland with a tie wrap ...
Page 53: ...Page 53 of 110 4 Tighten the gland cap 5 Secure the cable to the gland using a tie wrap ...
Page 63: ...Page 63 of 110 Note For this type of installation a 2RU space is required ...
Page 71: ...Page 71 of 110 Figure 24 V 45 Polarization B on Top Figure 25 Vertical Polarization ...