Page 57 of 110
PoE Injector Grounding
To ground the PoE Injector:
1.
On the right side of each PoE Injector, loosen the screw, plain washer, and serrated washer.
2.
Place the cable lug (supplied with the PoE injector kit) between the plain and serrated washer.
3.
Tighten the screw.
4.
Perform a resistance test between the 2 lugs of the GND cable. Verify that the result is 0-2 ohms.
PoE Injector Wall Mount Installation
List of Items
Item
Description
Quantity Remarks
1
PoE Injector
1
1
Glands Kit
1
For outdoor installations.
Note
Glands are required for outdoor installations. The glands kit (three or five glands) is not supplied with
the PoE Injector and must be ordered separately.
Glands Kit
Part number
Marketing Description
N000082L014A
PTP 820 Glands_x5_KIT
Required Tools
•
Metric offset wrench key wrench set
•
Hammer
•
Drilling Machine
Procedure
1.
Mount and tighten the PoE Injector to a wall using two M6 bolts and anchors. The M6 bolts and anchors
must be purchased separately.
Summary of Contents for PTP 820E
Page 1: ......
Page 44: ...Page 44 of 110 1 Secure the cable to the gland using a tie wrap ...
Page 47: ...Page 47 of 110 8 Tighten the gland cap 9 Secure the cable to the gland with a tie wrap ...
Page 53: ...Page 53 of 110 4 Tighten the gland cap 5 Secure the cable to the gland using a tie wrap ...
Page 63: ...Page 63 of 110 Note For this type of installation a 2RU space is required ...
Page 71: ...Page 71 of 110 Figure 24 V 45 Polarization B on Top Figure 25 Vertical Polarization ...