Storage
3-7
D-Ring Sliders
There are four D-Ring sliders that
move along rails on both sides of
the cargo management area. These
can be used as tie-downs when
storing cargo.
Installing D-Ring Sliders
To install the D-Ring slider (A),
insert it into the channel (B) located
in the middle of both rails.
The loop of the D-Ring slider must
be facing inward towards the
storage area and the ring must be in
the up position for proper usage.
Push the button to move the D-Ring
slider either towards the front or the
rear of the vehicle. The rings can be
locked into various positions along
the rail.
U-Rail
For vehicles with a U-Rail system,
move the gate around the u-shaped
track to store and secure cargo in
place.
Summary of Contents for 2010 SRX
Page 6: ...vi Introduction 2 NOTES...
Page 34: ...1 28 Keys Doors and Windows 2 NOTES...
Page 108: ...3 12 Storage 2 NOTES...
Page 111: ...Instruments and Controls 4 3 2 NOTES...
Page 112: ...4 4 Instruments and Controls Instrument Panel Overview...
Page 122: ...4 14 Instruments and Controls Instrument Cluster United States version shown Canada similar...
Page 238: ...6 72 Infotainment System 2 NOTES...
Page 304: ...8 60 Driving and Operating 2 NOTES...
Page 310: ...9 6 Vehicle Care Engine Compartment Overview 2 8 L V6 Engine...
Page 312: ...9 8 Vehicle Care 3 0 L V6 Engine...
Page 436: ...11 4 Technical Data Engine Drive Belt Routing 2 8L 3 0L V6 Engines...
Page 456: ...12 20 Customer Information 2 NOTES...