64
AQUOS - IDRON
EN
IT IS STRONGLy RECOMMENDED TO WASH THE ENTIRE SySTEM BEFORE CONNECTING THE
STOVE IN ORDER TO GET RID OF RESIDUES AND DEPOSITS.
Upstream from the stove, always install gate valves so as to disconnect it from the
plumbing system should it be necessary to move it, or when it requires routine and/or
special maintenance. Connect the stove using hoses so that the stove is not connected
too tightly to the system, and to allow slight movements.
The pressure discharge valve (C) must always be connected to a water drain pipe. The
pipe must be adequate to support the water’s high temperature and pressure.
Fig. 14 -
Plumbing connection
LEGEND
A
Tap
B
Domestic system
C
Pressure discharge
D
Hoses
6.4
SYSTEM FILLING
To fill the system, the stove can be equipped with an end piece (optional) with a check valve (D), for
manual filling of the heating system (if the optional is not installed, the filling tap on the main boiler will be
used). During this operation, any air in the system is released from the automatic vent valve located under
the top.
To allow the valve to vent, it is recommended to loosen the grey cap by one turn and leave the red
cap locked (see figure). The filling pressure of the system WHEN COLD must be 1 bar. If during operation
the system pressure drops (due to evaporation of gases dissolved in the water) to values lower than the
minimum ones indicated above, the user must use the filling tap to bring the pressure back up to its initial
pressure.
For proper operation of the stove WHEN HOT, the pressure in the boiler must be 1.5 bar.
To monitor system pressure, the end piece (optional) is equipped with a pressure gauge (M).
Upon completion of this filling operation, always close the tap.
Summary of Contents for aquos 15
Page 2: ......
Page 10: ...10 AQUOS IDRON IT Fig 4 Esempio di installazione prodotto a pellet ...
Page 13: ...13 AQUOS IDRON IT 4 DISEGNI E CARATTERISTICHE TECNICHE 4 1 DIMENSIONI Fig 7 Dimensioni ...
Page 29: ...29 AQUOS IDRON IT Fig 22 Configurazione 2 Fig 23 Configurazione 3 ...
Page 48: ...48 AQUOS IDRON IT 14 3 DICHIARAZIONE DI CONFORMITÀ Fig 33 Dichiarazione di conformità ...
Page 56: ...56 AQUOS IDRON EN Fig 4 Pellet stove installation example ...
Page 59: ...59 AQUOS IDRON EN 4 TECHNICAL DRAWINGS AND CHARACTERISTICS 4 1 DIMENSIONS Fig 7 Dimensions ...
Page 74: ...74 AQUOS IDRON EN Fig 22 Configuration 2 Fig 23 Configuration 3 ...
Page 93: ...93 AQUOS IDRON EN 14 3 DECLARATION OF CONFORMITY Fig 33 Declaration of Conformity ...
Page 101: ...101 AQUOS IDRON FR Fig 2 Exemple d installation d un produit à pellets ...
Page 104: ...104 AQUOS IDRON FR 4 DESSINS ET CARACTERISTIQUES TECHNIQUES 4 1 DIMENSIONS Fig 4 Dimensions ...
Page 120: ...120 AQUOS IDRON FR Fig 18 Configuration 2 Fig 19 Configuration 3 ...
Page 139: ...139 AQUOS IDRON FR 14 3 DÉCLARATION DE CONFORMITÉ Fig 29 Déclaration de conformité ...
Page 147: ...147 AQUOS IDRON ES Fig 4 Ejemplo de instalació del producto con pellet ...
Page 150: ...150 AQUOS IDRON ES 4 PLANOS Y CARACTERÍSTICAS TÉCNICAS 4 1 DIMENSIONES Fig 7 Dimensiones ...
Page 184: ...184 AQUOS IDRON ES 14 3 DECLARACIÓN DE CONFORMEDAD Fig 33 Declaración de conformedad ...
Page 193: ...193 AQUOS IDRON NL Fig 4 Installatievoorbeeld pelletkachel ...
Page 196: ...196 AQUOS IDRON NL 4 TEKENINGEN EN TECHNISCHE KENMERKEN 4 1 AFMETINGEN Fig 7 Afmetingen ...
Page 212: ...212 AQUOS IDRON NL Fig 22 Configuratie 2 Fig 23 Configuratie 3 ...
Page 231: ...231 AQUOS IDRON NL 14 3 CONFORMITEITSVERKLARING Fig 33 Conformiteitsverklaring ...