Series 90 Setup Manual
Page 11
ADDING SCANNER BOARDS
Scanner boards are added to the expansion cabinet to increase test point capacity. To add a
scanner board to an expansion cabinet, turn off power and disconnect the power cord. (Power
must be shut off on the entire system.)
Series 90E9/Series 90E32 Cabinets
On the 9-card Series 90E9 cabinet, remove the rear panel. On the 32-card Series 90E32 cabinet,
the rear panel is split into two halves; remove the panel on the side where the scanner board will
be installed. All scanner boards must be installed consecutively in the card cage without
skipping one. As shown in Figure 10, scanner boards are installed from the bottom left and
upward. When the top slot is filled, the next board is inserted into the right-hand column, at the
bottom, with additional boards continuing toward the top. If more capacity is needed after the
last slot has been filled, a new cabinet must be added. (Refer to Adding Expansion Cabinets,
earlier in this section.)
When top right slot
is filled, a new
cabinet can be added
.
FU
S
E
FU
SE
F
U
S
E
Start here and add
When top left slot
scanner
boards
is filled, start here
upward
to fill right slots
(Three boards shown, leaving six empty slots)
Figure 10. Series 90E9 Scanner Board Locations
NOTE
The low-voltage Series 90 scanner boards must have jumpers installed before
they are inserted into the expansion cabinets. For jumper location and settings,
refer to Scanner Board Jumpers, later in this section on page 14.
Summary of Contents for 90 Series
Page 1: ...Cablescan Series 90 SETUP MANUAL 90 90 ...
Page 2: ......
Page 56: ......
Page 57: ...5900407 Rev D Cablescan ...