Operation
Chapter 7
Operating the machine
Page 66
Version: 3/25/20
Translation of the original operating manual 116588
Bernard van Lengerich
Fig. 7-6: Adjusting the opening width
3.
Adjust the opening width of the discharge opening (b).
3.1
Open protective covers (d).
3.2
Reach through the doors (c).
3.3
Use a size 17 box or open-end wrench to loosen the four fixing bolts (e) at each
dosing gate (f).
3.4
Evenly move the dosing gate (f) until the discharge opening (b) has reached the
desired opening width.
3.5
Re-tighten all fixing bolts (e).
The desired opening width of the discharge opening has been set.
d
e
f
e