User Guide
57
www.bull.com
Modifying the server from tower to rack-mount type
1.
Remove the front bezel.
2.
Remove the four stabilizers from the bottom of the server (4 screws).
Figure 14: Removing the stabilizers
3.
Mount the stud to the front face of the server.
4.
Using the screws securing the dummy cover mounted on the vacant slot of
5.25-inch device, put the device cover over the dummy cover, and secure it
together with the dummy cover.
Figure 15: Mounting the dummy cover
5.
According to your system configuration, secure the 3.5-inch HDD cover to the
front cover with metric screw (M4).
■
3.5-inch fixed disk model
Summary of Contents for NovaScale T840 E2
Page 1: ...NovaScale T840 E2 User s Guide NOVASCALE REFERENCE 86 A1 43FB 01 ...
Page 2: ......
Page 34: ...User Guide 34 www bull com ...
Page 58: ...User Guide 58 www bull com 3 5 HDD cover 3 metric screws M4 Figure 16 Securing the HDD cover ...
Page 112: ...User Guide 112 www bull com Refer to Advanced Menu on page 174 for more information ...
Page 130: ...User Guide 130 www bull com The installation is completed ...
Page 134: ...User Guide 134 www bull com Installing the Operating System without Express Setup ...
Page 169: ...User Guide 169 www bull com Figure 76 Diagnostic LED POST Code Decoder continued ...
Page 209: ......
Page 210: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 43FB 01 ...